25 kV AC single phase OHE Design, Supply, Erection, Testing & Commissioning
OHE alteration work due to development of 2'nd entry including yard
Providing Burried Rail Earthing at all Swithching Post in Kota Division
Reconditioning of Existing Earthing pit
Augmentation of traction transformers capacity by replacing 12.5 MVA transformers
Electrification of Line no. 5 & 6 at Sonipat Station
OHE Design, Supply, Erection, Testing for delhi tilak bridge
Design, manufacture, supply, erection, testing & commissioning of power supply installation
OHE alteration work due to track renewal
Replacement of Existing lead acid batteries installed at TSS, SP, SSP and RC for TRD section of Bhopal
TRD work in Connection with extension of platform
Design, supply, erection, testing and commissioning of Control and relay panel
25 KV AC OHEin connection with Electrification
Electrification of PFT siding taking off from Patli Station
Replacement of Static Control Panels with Numerical Relay Panels at TSS
Replacement of obsolete & over aged by 25 kV Double pole vacuum Circuit Breaker
Capacitor Bank and Series Reactor Replacement
Installation for Electrification of Concor PFT Siding at Rajlugarhi
Additional Works for 2x25 kV AT Feeding OHE System
Traction Transformer at Chiheru Traction Sub Station
Electrification & Facility Upgradation at Shakurbasti DEMU Shed
2x25 kV AT Feeding OHE System Of Indian Railway Alongwith